The first step was to provide all training fields with moveable senior soccer goals, equipped with an “easy lifting system” to move the goals easily and efficiently.
For the indoor training field, we have custom-made goals, also equipped with this “easy lifting system” and a professional powder coating.
We also provided numerous smaller training goals measuring 1.20m x 1.00m. All goals were professionally powder coated.
The next step, after assembling and installing the goals, was to symmetrically measure and line the 4 new training fields. For this, we used robotic technology to precisely measure out the fields in combination with the high-pressure line marking machines up to 40bar for the most optimal result on these hybrid fields. The robot provided surveying and a first light coat of line marking paint (pre-marking). This was given a finishing touch afterwards under high pressure.

On the practice fields of the Jan Breydel Stadium, the mobile dug outs equipped with an anti-tilt system were chosen.
We are very proud of the result achieved, thank Club Brugge for their trust and wish them much success with this wonderful practice complex.